Ocean
going, designed for and - anticipated payload, sailing performance,
bridgedeck clearance, an interior arrangement conducive to long-term
live aboard and an aesthetic fitout.
Building
starts right way up from the beginning - no
turning over of hulls
INCLUDED
IN THE KIT . . .
-
Round
bilge hulls finished up to water line.
-
Decks
and outer hull sides port & starboard; Deck incorporating moulded
non skid, stern steps, swim ladders recessed mounting points, engine
hatches, cockpit seating, hatch mounting areas, stanchions and cleat
mounting points. Outer hull moulded down to water line height.
-
Inner
hull sides with chamfer panels port & starboard.
-
Forward
web with anchor lockers and bridge deck stiffeners with moulded non
skid.
-
Bridge
deck with stiffeners.
-
Saloon
roof with extension over the cockpit area, moulded hatch area points
(2 medium, 2 small), headsail tracks, turning block pads, winch pads,
anchor winch mounting point, and moulded non skid.
-
Cockpit
stern seat incorporating mainsheet track and winch pad positions.
-
Catwalk
with non skid.
-
Centre
cases in halves.
-
Dagger
boards in halves.
-
Rudders
in halves.
-
Bow
noses.
-
Anchor
lockers hatches covers.
-
Anchor
winch hatch cover.
-
Anchor
chain/rope hatch cover.
-
Cockpit
seats lids/hatch covers.
-
Engine
room cover hatches with non skid.
-
Swim
ladder cover lids.
-
Steering
station plinth.
-
Steering
station base.
-
Instruments
and engines control panel.
Flat
Panel Pack
-
Bulkheads
CNC cut with jigsaw puzzled joining points.
-
Floors
soles and under floor sole structure, marked ready for cutting out.
Other
-
Filament
wound rudder trunk tubes.
-
Bulkhead
positions marked in the hulls at our workshop for accuracy and time
saving.
-
Aluminium
forebeam complete, fully manufactured.
-
Building
assembly jig.
Material
to assemble and bond the kit
-
Resin
and catalyst.
-
Tapes
for bonding and reinforcing components.
-
Powders
for filling, fairing and gluing
-
Timber
for compression post.
Assembly
Instruction and Engineering Drawings
-
Assembly
manual.
-
Set of
drawings for sail plan,engineering items, plumbing, electrical and
other.
-
Material
Safety Data Sheets.
COMPLETE
FACTORY BACK UP WITH THE PROJECT
Construction
and materials.
Construction
of the kit utilises infusion method and modern composite moulding techniques.
Hull and deck structures are built utilising modified epoxy resins,
core materials are a combination of PVC foam and end grain balsa, with
multiaxial glass cloths as reinforcement. All parts that require bonding
via glass tapes is performed in rebated grooves of the moulded parts,
requiring very minimal fairing and colour blending at the end of the
job.
Made
In Victoria Australia
Stage 1 No Furniturexx x x x x x x xxxxxxxx
$ Email
Options,
Targa bar moulding. xxx xxx
xxx xxx
xxx xxx
xxPOA
Swim duckboard moulding between the hulls.xxxPOA
Furniture mouldings as required. xxx
xxx xxx
xx POA
Other option as neededxxxxxxxxxxxxxxxxxxxxxPOA
xxxxxxxxxxxxxxxxxxxxxxx
|
|




|